•  
  •  
 
Future Engineering Journal

Abstract

The recent booming in the power network industry inspired a lot of researchers to develop models to estimate the optimum cost of transmission towers. Unlike previous researches which depended on design the tower from scratch, this research depends on collecting actual database from several projects around the globe and applying the well-known (GP) technique to develop a model to predict the tower weight. The accuracy of the developed formula was about 84%. The developed model could be used in early tender stage or to check design economy.

Share

COinS
 
 

To view the content in your browser, please download Adobe Reader or, alternately,
you may Download the file to your hard drive.

NOTE: The latest versions of Adobe Reader do not support viewing PDF files within Firefox on Mac OS and if you are using a modern (Intel) Mac, there is no official plugin for viewing PDF files within the browser window.